Fire Protection System Replacement – Hyde Park
FSPM was engaged by the board at this Hyde Park Association to manage the fire protection system replacement. Work included:
- Disconnection and removal of existing fire pump
- Disconnection of related switches and gear controls
- Installation of new fire pump system including:
- Backflow preventer
- Fire Pump
- Fire Pump Controller
- Fire Pump bypass jockey pump
- Jockey pump controller
- Outside test header
-
- Maintain adequate power to supply fire pump and all related equipment
- After installation, perform all tests required to ensure proper operation of all equipment